|
TYPICAL
REMOVAL
Join
us for a quick tour through the journey of a house removal as it makes
it's way from the old block to the new block.
Step
One: The
house as it stands prior to be removed.

Step
Two: Loading house onto truck and lowering
the roof.
Step
Three: House in transit.

Step
Four: Sometimes a machine may be needed on site.

Step
Five: Roof back on, stumped but awaiting lowering.

Step
Six: Lowered, new roof and gutters, on new stumps and tied down

|